Tests and experimental validations

The following tests are planned to be executed:

Test targets:

  • Stable active operation and control of the complete subsystem
  • Development of safe start-up, shut-down and stand-by procedures
  • Test of soot formation protection mechanism
  • Test of AVL regeneration approach
  • Test of carbon deposition inside the Evaporator
  • Test of boundary conditions with different evaporator designs
  • Gas composition measuring with different operation conditions

Test order:

  • Test build up with the mentioned components
  • Basic tests of operating procedures and control algorithms
  • Calibration of control algorithms
  • Test and development of all operating procedures and control algorithms
  • Test of different operation conditions
  • Carbon deposition test for 10h with different porous media.
  • Test with different evaporator geometries