The following tests are planned to be executed:
Test targets:
- Stable active operation and control of the complete subsystem
- Development of safe start-up, shut-down and stand-by procedures
- Test of soot formation protection mechanism
- Test of AVL regeneration approach
- Test of carbon deposition inside the Evaporator
- Test of boundary conditions with different evaporator designs
- Gas composition measuring with different operation conditions
Test order:
- Test build up with the mentioned components
- Basic tests of operating procedures and control algorithms
- Calibration of control algorithms
- Test and development of all operating procedures and control algorithms
- Test of different operation conditions
- Carbon deposition test for 10h with different porous media.
- Test with different evaporator geometries